With the van completely empty and looking shabby, I really needed to get on and finish the job. The interior was mostly done (well, the new doors I cut out needed routing – so that I can put trim around the edge – and hinges, catches etc) but while the van was empty I decided to give it a make-over (see previous post for the list).
The hardest job was putting new windows in (or old windows with new rubbers). I really needed a swear box, especially when the helpful leverage supplied by screwdriver slipped and scratched the freshly tinted windows! This was not an easy job, and I am not looking forward to doing it again. Ever.
Here’s a bit of the progress from that part of the refurb, done over 12 hours:
On the Saturday just gone, I finally put the refurbed interior back in. It was a bit of a jigsaw, and I discovered that I was missing one piece (thankfully, not a crucial part, and one I can make up out of MDF quite easily). There are still some final bits of work needed – some trimming, floor, and a few other odds and sods, but basically the donkeywork is all done now. And here’s the (almost) finished result: